The main challenge of this project was that it had to be finished in a very short period of time. Build with the method of prefabrication of modules, the main difficulty was that each basic module would have to be transported on a truck. The bearing body was made of stratified sheet metal, while the exterior walls were constructed from insulated panels. All of the structure cladded, along with the roofs, with exterior wall insulation.